Ten Steps to Increase Jobsite Productivity | ||
James J. Adrian, Ph.D., PE, CPA | ||
Productivity equals
profitability. Between 40 and 60 percent of a typical
construction day is taken up by non-productive time. Waiting on
resources or assignments, multiple material handling, and redo work adds
to lost profits. This book is designed to held builders turn nonproductive
time into productive time, while improving quality, safety, productivity,
and profitability
Table of Contents
$39.00 Softcover, 160pp. 2002
|